Team 5
Team Members |
Faculty Advisor |
John Begazo |
Manish Roy Sponsor Denison Society |
sponsored by
Powerline Hike/Bike Trail Design
The Denison Homestead Hike/Bike Trail Project, undertaken by Senior Design Team CE 05 at the University of Connecticut, aims to design an environmentally sustainable recreational trail in Mystic, CT. The trail will run along the eastern portion of the Eversource distribution powerline, continuing from the previously planned section west of Pequotsepos Road. The project addresses the rising demand for safe biking and hiking trails while ensuring minimal environmental impact and compliance with local regulations. Key components include site assessment, trail alignment, traffic signage, and sustainability considerations. Challenges include limited space for parking while meeting zoning regulations, maintaining long-term trail durability, and integrating traffic calming measures to improve safety at the Pequotsepos Road crossing. The project also includes a detailed construction schedule and cost estimate. CAD drawings will present the final design and three alternative layouts, with a focus on balancing accessibility, functionality, and environmental preservation.