Figure 1
Figure 2
Team 04
Team Members |
Faculty Advisor |
Ben Smith |
Nicholas Lownes Sponsor WSP |
sponsored by
Glastonbury Roundabout and Culvert Design
This project involves replacing a signalized intersection with a roundabout at the intersection of the CT Route 17 on and off ramps and New London Turnpike in the town of Glastonbury, CT. Additionally, there is an unnamed water course passing through an existing 42" culvert on the project site, and this culvert will be replaced. After researching applicable design standards and guidance, a Preliminary (30%) plan set has been prepared.