team photo


Team 11

Team Members

Faculty Advisor

Quinn Havard
Alexander Foster
Matthew Barber
Lea Brinton

Wei Zhang

Sponsor

HDR, Inc.

sponsored by
sponsor logo

Beacon Falls Station High Platform Upgrade

This project includes the design of a new high level platform for the Beacon Falls railway station. A high level platform is one that is level with the railcars, so that passengers so not have any change in elevation between the railcar and the platform. The station also needs the track realigned with the changing of the platform. This project tasks our group to complete a 15% design of the track realignment, the 350 foot long high level platform, the canopy on top of the platform, and the station parking lot site work.