Team 12

Team Members

Faculty Advisor

James Missell
Haseeb Qureshi
Chrystel Acosta
Julie Sierra
Diego Barajas

Wei Zhang

Sponsor

National Guard

sponsored by
sponsor logo

TASM-G Flood Mitigation Plan, Groton, CT

Our team's objective is to design a solution to alter the 1% annual floodplain in order to allow for the expansion a facility without any of its footprint falling within the 100 year floodplain plus two feet of elevation. Our focus has been directed towards the strategies that can be employed through sitework, water retention, grading, site elevation, water redirection, or any other mitigation techniques. Communications with our sponsor have helped us narrow our scope to finding where construction is feasible on the site, what work will be done to mitigate the flood levels, and the cost of this work.