Author: Senior Design 2023 – Mechanical Engineering Team 57
ME57: Laser Welding Fixture Improvements
The Team:
Audrey Rivetta
Ishu Joshi
Fig. 1 The Team
Faculty Advisor:
Georgios Matheou
Sponsor Advisor:
Brandon Kumnick
Overview:
The goal of this project is to redesign a welding fixture for TOMZ corporation in order to reduce the cycle time and decrease the amount of argon consumed per cycle. Achieving these goals will increase the production rate of a critical part at TOMZ as well as reduce the cost of each part. Currently, during the welding procedure, TOMZ corp. fills the chamber (Fig. 3) with argon and laser welds two components together. After analyzing different shapes, the team circled in on the new geometry of the chamber (Fig. 2). Along with the redesign in the interior of the chamber, the team also reestablished the process of the alignment of the two sub components, decreasing the cycle time of the process.